Identified in the City 2024-2028 Capital Improvement Plan is a full depth reclamation repaving of miles of City streets. When roadways are deteriorated past the viable point of a mill and overlay, full depth reclamation or reconstruction is proposed. A full depth reclamation is expected to prolong the life of the roadways 30+ years before a complete reconstruction would be considered.
Full depth reclamation projects would include grinding up the existing pavement section and constructing a new 3" bituminous roadway. Existing concrete curb and gutter would remain in place with limited replacement where warranted. Also included would be minor utility repairs.
The areas identified for full depth reclamation in 2024 include: Hills of Bunker Lake 1st thru 4th Additions, and the following cul-de-sacs in the Meadows of Round Lake - 145th Ave, 145th Lane, 146th Ave, and 146th Lane. Click here (2-pages) for a project location map.
25% of the project costs are proposed to be assessed to properties fronting the improvements. The remaining 75% of the project costs will be funded through the Citys Road and Bridge Fund. Residents in these areas will be mailed an update letter and invited to the public hearing once it's scheduled.
For questions related to this project please contact Jason Law at 763-767-5130 or David Berkowitz 763-767-5133.